Case study
Release Calendar
A static, hand-coded carousel became a calendar that builds itself from CMS data, and the path to shop dropped from 6+ clicks to 2 or 3.
Results
- 2 to 3
- 10 min
- Zero
- 65
The calendar went live in November 2026. These are my own before and after counts, not launch analytics yet. Structure and behavior are what shipped. Names, dates and visual styling are changed for confidentiality.
The challenge
Independent sellers, who run their own businesses on our products, plan around product releases. The page that told them what was coming failed two groups.
Sellers needed six or more clicks to shop a release: search for the preorder, find the category, search again. And the dates were sometimes wrong, because the page was raw HTML and the team that owned it could not edit it.
I built that HTML myself, as a static carousel, when there were no developers to spare. It was the right call then. When I mapped what it was costing, I pitched the rebuild.
- A hand-coded carousel, low on the page
- Every date change goes through a designer or developer
- Search, find the category, search again: 6+ clicks
- Rolling to the current month means editing HTML
- A calendar at the top of the page, built from CMS data
- The page owner enters an event in a form they already know
- Shop links up front, preorder one click away: 2 to 3 clicks
- The calendar rolls forward by itself
The old page had no logic at all, so every new case was a rebuild. The new one treats a release as data.
The calendar
Try it
This is the working calendar. Pick a day, flip the months, and open the release times.
Release Calendar
Dots in the grid, detail in the panel. Each day shows a dot per release type. Names and shop buttons sit in the panel. Text inside the cells breaks when two releases share a day, and has nowhere to go on a phone.
A preorder block that exists only when it matters. While a window is open, a block at the top of the panel links straight to that release. When the window closes, it disappears.

Same day, window open (left) and closed (right). When it closes, the block disappears.
Add to calendar is designed and slated for the next pass.
The workflow
A release is one entry
The calendar is half the project. The other half is the workflow that feeds it. Without it, the dates would be wrong again within a quarter.
An event became one CMS entry: a release type, a milestone, and explicit dates. Type and milestone are controlled choices, so each maps to a color and a translation key automatically. The same entry feeds this page and the calendar on the seller homepage, which used to be loaded by hand.
It had to live in a CMS that does not do dynamic components. We built a Vue component fed by a CMS widget, with every string wired for translation, under a strict page-weight cap. I also wrote a Playwright script that loads a year of events from a spreadsheet in about ten minutes.
Approach
What I ruled out.
Keeping the carousel and feeding it from the CMS fixes editing but not shopping. A plain list works at five items. This page covers up to 14 months, often with several releases a month.
What held through every decision.
Shop links come first, because that is why people open the page. The page owner can change anything without a developer. And it is built for the busiest future state, not launch day.
What I'd carry forward
Design the entry side with the interface. The calendar only works because the person entering an event has a clear, controlled form. I also kept a running decision log, which is what made the handoff hold when the developer changed mid-build.
Look at the data load earlier. The page-weight cap and the shape of the feed decided more of the design than I expected, and I met them late.
Putting a dynamic component into a CMS not built for one is mostly a data problem. The work was agreeing on what an event is, which fields are controlled, and which strings get translated.