Case study

Release Calendar

A static, hand-coded carousel became a calendar that builds itself from CMS data, and the path to shop dropped from 6+ clicks to 2 or 3.

Timeline
One quarter plus two sprints, 2026
Role
Lead designer and project owner
Team
One developer and the Martech team
Tools
Figma Sitefinity Vue

Results

2 to 3
Clicks to shop a release, down from 6+ Shop links sit at the top of the page, and the preorder button appears on its own whenever a window is open.
10 min
To load a year of events The homepage calendar needed a year of events entered by hand, sometimes a full day. A Playwright script loads them now.
Zero
HTML edits to change a date Events are entered in the CMS. The calendar rolls to the current month by itself.
65
Events the design is built to hold Across a 14-month range, with new release types fitting without a redesign.

The calendar went live in November 2026. These are my own before and after counts, not launch analytics yet. Structure and behavior are what shipped. Names, dates and visual styling are changed for confidentiality.

The challenge

Independent sellers, who run their own businesses on our products, plan around product releases. The page that told them what was coming failed two groups.

Sellers needed six or more clicks to shop a release: search for the preorder, find the category, search again. And the dates were sometimes wrong, because the page was raw HTML and the team that owned it could not edit it.

I built that HTML myself, as a static carousel, when there were no developers to spare. It was the right call then. When I mapped what it was costing, I pitched the rebuild.

Before
  • A hand-coded carousel, low on the page
  • Every date change goes through a designer or developer
  • Search, find the category, search again: 6+ clicks
  • Rolling to the current month means editing HTML
After
  • A calendar at the top of the page, built from CMS data
  • The page owner enters an event in a form they already know
  • Shop links up front, preorder one click away: 2 to 3 clicks
  • The calendar rolls forward by itself

The old page had no logic at all, so every new case was a rebuild. The new one treats a release as data.

The calendar

Try it

This is the working calendar. Pick a day, flip the months, and open the release times.

Release Calendar

Preorders live now
Autumn Collection
Preorder Period
Jun 1 to Jun 22
Shop Preorder
July Monthly Drop
Preorder Period
Jun 1 to Jun 22
Shop Preorder
June 2027
CollectionsMonthly DropsBundles
Tuesday, June 8
Next up

Dots in the grid, detail in the panel. Each day shows a dot per release type. Names and shop buttons sit in the panel. Text inside the cells breaks when two releases share a day, and has nowhere to go on a phone.

A preorder block that exists only when it matters. While a window is open, a block at the top of the panel links straight to that release. When the window closes, it disappears.

Two crops of the detail panel for the same day. On the left a preorder window is open, so a green live block with two Shop Preorder buttons sits above the day's release. On the right the window has closed: the block is gone and the day's release moves to the top.

Same day, window open (left) and closed (right). When it closes, the block disappears.

Add to calendar is designed and slated for the next pass.

The workflow

A release is one entry

The calendar is half the project. The other half is the workflow that feeds it. Without it, the dates would be wrong again within a quarter.

An event became one CMS entry: a release type, a milestone, and explicit dates. Type and milestone are controlled choices, so each maps to a color and a translation key automatically. The same entry feeds this page and the calendar on the seller homepage, which used to be loaded by hand.

CMS · Events
New event
Publish
Release nameAutumn Collection
Release typeCollection
MilestonePreorder Period
Preorder opens06/01/2027
Preorder closes06/22/2027
Customer launch06/24/2027

It had to live in a CMS that does not do dynamic components. We built a Vue component fed by a CMS widget, with every string wired for translation, under a strict page-weight cap. I also wrote a Playwright script that loads a year of events from a spreadsheet in about ten minutes.

Approach

What I ruled out.

Keeping the carousel and feeding it from the CMS fixes editing but not shopping. A plain list works at five items. This page covers up to 14 months, often with several releases a month.

What held through every decision.

Shop links come first, because that is why people open the page. The page owner can change anything without a developer. And it is built for the busiest future state, not launch day.

What I'd carry forward

Design the entry side with the interface. The calendar only works because the person entering an event has a clear, controlled form. I also kept a running decision log, which is what made the handoff hold when the developer changed mid-build.

Look at the data load earlier. The page-weight cap and the shape of the feed decided more of the design than I expected, and I met them late.

Putting a dynamic component into a CMS not built for one is mostly a data problem. The work was agreeing on what an event is, which fields are controlled, and which strings get translated.